City of Elmhurst Public Works & Buildings Committee met Feb. 9
City of Elmhurst Public Works & Buildings Committee met Feb. 9
Here are the minutes provided by the committee:
1. Call to Order:
Ald. Bastedo called the meeting to order at 7:00p.m.
2. Roll Call – Attendance: -
Present: Committee Members
Ald. Bastedo Ald. Hill (Public Comment)
Ald. Bram
Ald. Baker
Ald. Irby
Absent: None
Quorum Present: 4 present - (quorum)
Also in attendance: Public Works Director Balicki
Asst. Public Works Director Tiberi
City Engineer Sianis
Finance Director Coyle (Item C)
Public Present: 12 Residents
3. Public Comments:
• Ald. Hill – North Graue Woods – Stormwater Mitigation Referral
• Dave McKenna – Tree Referral and Flooding
• Tracy Fleischer – Stormwater Mitigation Referral – S Washington St.
• Dave & Tina Czerwinski –Stormwater Mitigation Referral
• Mary Jaldonski– Stormwater Mitigation Referral – Spring North of Van Buren
• Kendra Thompson – Stormwater Mitigation – Crestview
• Kathleen Sullivan – Stormwater Mitigation Referral
• Emily Moran – Ferndale – Stormwater Mitigation Referral
• Mary Oehler - 352 Shady Lane – Flooding Task Force
• Alan Vasdick – 360 Shady Lane – Flooding Task Force
• Michelle Dwyer – 351 Shady Lane – Flooding Task Force
• Lisa Dirks – Elmhurst Cool Cities – Tree Referral
4. Receipt of Written Communications:
• Tree Referral (3)
5. Business Before the Committee:
A. Minutes of the January 26, 2026, Public Works & Building Committee:
Ald. Bram to approve the January 26, 2026 Minutes of the Public Works & Building Committee; Ald. Baker seconded Voice vote. Motion carried 4-0 (Bastedo, Bram, Baker, Irby). Minutes approved.
B. Referral - Stormwater Improvement Projects Prioritization Discussion:
City Engineer Sianis presented the agenda item.
C. Rate Adjustment for Refuse and Yardwaste Collection Services:
Finance Director Coyle and Public Works Director Balicki presented agenda item. Ald. Baker motioned to approve the draft report, Ald. Bram seconded. Motion carried 4-0 (Bastedo, Bram, Baker, Irby). Report approved
D. NW Elmhurst Street Reconstruction - Construction Bids:
City Engineer Sianis presented agenda item. Ald. Bram motioned to approve the draft report, Ald. Irby seconded. Motion carried 4-0 (Bastedo, Bram, Baker, Irby). Report approved
E. NW Elmhurst Street Reconstruction - Construction Eng. Contract:
City Engineer Sianis presented agenda item. Ald. Irby motioned to approve the draft report, Ald. Bram seconded. Motion carried 4-0 (Bastedo, Bram, Baker, Irby). Report approved
F. Engineering Plan Review Services:
City Engineer Sianis presented agenda item. Ald. Irby motioned to approve the draft report, Ald. Baker seconded. Motion carried 4-0 (Bastedo, Bram, Baker, Irby). Report approved
G. York Street Resurfacing & Prairie Path Crossing Improvements Phase I Engineering:
City Engineer Sianis presented agenda item. Ald. Baker motioned to approve the draft amended report, Ald. Bram seconded. Motion carried 4-0 (Bastedo, Bram, Baker, Irby). Amended report approved
H. Streetlight Controller Upgrades:
Asst. Public Works Director Tiberi presented agenda item. Ald. Bram motioned to approve the draft report, Ald. Irby seconded. Motion carried 4-0 (Bastedo, Bram, Baker, Irby). Report approved
I. Referral – Tree Ordinance:
Asst. Public Works Director Tiberi presented agenda item.
6. Other Business: None
7. Adjournment:
Meeting adjourned at 10:07 pm.
https://go.boarddocs.com/il/coe/Board.nsf/Public