City of Elmhurst Public Works & Buildings Committee met Feb. 9

Elmhurst City Hall
Elmhurst City Hall | Elmhurst city facebook
By Angelica Saylo Pilo

City of Elmhurst Public Works & Buildings Committee met Feb. 9

Here are the minutes provided by the committee:

1. Call to Order:

Ald. Bastedo called the meeting to order at 7:00p.m.

2. Roll Call – Attendance: -

Present: Committee Members

Ald. Bastedo Ald. Hill (Public Comment)

Ald. Bram                               

Ald. Baker

Ald. Irby

Absent: None

Quorum Present: 4 present - (quorum)

Also in attendance: Public Works Director Balicki

Asst. Public Works Director Tiberi

City Engineer Sianis

Finance Director Coyle (Item C)

Public Present: 12 Residents

3. Public Comments:

• Ald. Hill – North Graue Woods – Stormwater Mitigation Referral

• Dave McKenna – Tree Referral and Flooding

• Tracy Fleischer – Stormwater Mitigation Referral – S Washington St.

• Dave & Tina Czerwinski –Stormwater Mitigation Referral

• Mary Jaldonski– Stormwater Mitigation Referral – Spring North of Van Buren

• Kendra Thompson – Stormwater Mitigation – Crestview

• Kathleen Sullivan – Stormwater Mitigation Referral

• Emily Moran – Ferndale – Stormwater Mitigation Referral

• Mary Oehler - 352 Shady Lane – Flooding Task Force

• Alan Vasdick – 360 Shady Lane – Flooding Task Force

• Michelle Dwyer – 351 Shady Lane – Flooding Task Force

• Lisa Dirks – Elmhurst Cool Cities – Tree Referral

4. Receipt of Written Communications:

• Tree Referral (3)

5. Business Before the Committee:

A. Minutes of the January 26, 2026, Public Works & Building Committee:

Ald. Bram to approve the January 26, 2026 Minutes of the Public Works & Building Committee; Ald. Baker seconded Voice vote. Motion carried 4-0 (Bastedo, Bram, Baker, Irby). Minutes approved.

B. Referral - Stormwater Improvement Projects Prioritization Discussion:

City Engineer Sianis presented the agenda item. 

C. Rate Adjustment for Refuse and Yardwaste Collection Services:

Finance Director Coyle and Public Works Director Balicki presented agenda item. Ald. Baker motioned to approve the draft report, Ald. Bram seconded. Motion carried 4-0 (Bastedo, Bram, Baker, Irby). Report approved 

D. NW Elmhurst Street Reconstruction - Construction Bids:

City Engineer Sianis presented agenda item.  Ald. Bram motioned to approve the draft report, Ald. Irby seconded. Motion carried 4-0 (Bastedo, Bram, Baker, Irby). Report approved 

E. NW Elmhurst Street Reconstruction - Construction Eng. Contract:

City Engineer Sianis presented agenda item. Ald. Irby motioned to approve the draft report, Ald. Bram seconded. Motion carried 4-0 (Bastedo, Bram, Baker, Irby). Report approved 

F. Engineering Plan Review Services:

City Engineer Sianis presented agenda item. Ald. Irby motioned to approve the draft report, Ald. Baker seconded. Motion carried 4-0 (Bastedo, Bram, Baker, Irby). Report approved 

G. York Street Resurfacing & Prairie Path Crossing Improvements Phase I Engineering:

City Engineer Sianis presented agenda item. Ald. Baker motioned to approve the draft amended report, Ald. Bram seconded. Motion carried 4-0 (Bastedo, Bram, Baker, Irby). Amended report approved 

H. Streetlight Controller Upgrades:

Asst. Public Works Director Tiberi presented agenda item. Ald. Bram motioned to approve the draft report, Ald. Irby seconded. Motion carried 4-0 (Bastedo, Bram, Baker, Irby). Report approved 

I. Referral – Tree Ordinance:

Asst. Public Works Director Tiberi presented agenda item.

6. Other Business:  None

7. Adjournment:  

Meeting adjourned at 10:07 pm.

https://go.boarddocs.com/il/coe/Board.nsf/Public