The meeting was called to order by Chair Donald Puchalski at 10:00 AM.
2. ROLL CALL
PRESENT: Chaplin (Remote), DeSart (Remote), Krajewski (Remote 10:10 AM), Ozog (Remote), Puchalski, Zay
ABSENT:
3. PUBLIC COMMENT
Public Comment limited to 3 minutes per person
4. APPROVAL OF MINUTES
A. Transportation Committee - Regular Meeting - Mar 16, 2021 10:00 AM
RESULT: ACCEPTED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
5. CONSENT ITEMS
A. Consent Item -- Amendment to County contract 4318 SERV issued to Rush Truck Center of Illinois to furnish and deliver four (4) Tandem Axle Six-Wheelers with Snow and Ice Equipment for the Division of Transportation, to extend the contract completion date through June 30, 2021, for no change in County cost.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
6. PROCUREMENT REQUISITIONS
A. Recommendation for the approval of a contract to S&S Signs and Safety Equipment, Inc., to furnish and deliver roll-up signs, as needed for the Division of Transportation, for the period May 1, 2021 through May 30, 2022, for a contract total not to exceed $20,000; Per renewal option under bid award 18-024-BF, third and final option to renew.
RESULT: APPROVED [UNANIMOUS]
MOVER: Mary Ozog, Vice-Chair
SECONDER: James Zay, District 6
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
B. Recommendation for the approval of a contract to Lordon, Inc., to furnish and deliver sign post reflectors, as needed for the Division of Transportation, for the period May 1, 2021 through April 30, 2022, for a contract total not to exceed $20,775; Per renewal option under bid award 19-020-DOT, second of three options to renew.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
Motion to combine Items 6C through 6P
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
C. FM-P-0076-21 Recommendation for the approval of a contract to ComEd, for electric utility distribution services for the connected County facilities, for Facilities Management, for the period April 14, 2021 through April 30, 2024, for a total contract amount not to exceed $3,000,000, per 55 ILCS 5/5-1022 “Competitive Bids” (c) Not suitable for competitive bids – Public Utility. ($2,176,845 for Facilities Management, $10,850.52 for Animal Services, $545,389.60 for the Care Center, $90,238.90 for the Division of Transportation, and $176,675.98 for the Health Department)
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
D. FM-P-0074-21 Recommendation for the approval of a contract to A&P Grease Trappers, Inc., for sanitary, grease trap and storm basin pumping, jetting and cleaning, as needed for the County campus, for Facilities Management, for the period April 14, 2021 through April 13, 2022, for a total contract not to exceed $124,060, ($7,325 for Animal Services, $17,550 for the Division of Transportation and $99,185 for Facilities Management) per lowest responsible bid #21-017-FM.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
E. DT-P-0075-21 Recommendation for the approval of a contract to Vulcan Construction Materials, LLC, to furnish and deliver Coarse and Fine Aggregates, as needed for the Division of Transportation ($30,000) and Public Works ($70,000), for a contract total not to exceed $100,000; Per lowest responsible bid 21-007-DOT.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
F. DT-P-0088-21 Recommendation for the approval of a contract to Ozinga Ready Mix Concrete, Inc., to furnish and deliver Portland Cement Concrete, as needed for the Division of Transportation and Public Works, for the period April 14, 2021 through April, 13, 2022, for a contract total not to exceed $90,000; Per lowest responsible bid 21- 007-DOT.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
G. DT-P-0078-21 Recommendation for the approval of a contract to Compass Minerals America, Inc., to furnish and deliver bulk rock salt, as needed for the Division of Transportation, for the period June 1, 2021 through May 31, 2022, for a contract total not to exceed $1,622,600; Per renewal option under bid award 20-035-DOT, first of three options to renew.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
H. DT-P-0079-21 Recommendation for the approval of a contract to DuKane Asphalt Company, to furnish and deliver bituminous Paving Materials for the central region, as needed for the Division of Transportation, for the period April 14, 2021 through April 13, 2022, for a contract total not to exceed $100,000; Per lowest responsible bid 21-007-DOT.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
I. DT-P-0080-21 Recommendation for the approval of a contract to K-Five Construction Corporation, to furnish and deliver bituminous Paving Materials for the southeast region, as needed for the Division of Transportation, for the period April 14, 2021 through April 13, 2022, for a contract total not to exceed $100,000; Per lowest responsible bid 21-007-DOT.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
J. DT-P-0081-21 Recommendation for the approval of a contract to Plote Construction, Inc., to furnish and deliver bituminous Paving Materials for the western region, as needed for the Division of Transportation, for the period April 14, 2021 through April 13, 2022, for a contract total not to exceed $50,000; Per lowest responsible bid 21-007-DOT.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
K. DT-P-0082-21 Recommendation for the approval of a contract to Rilco, Inc., to furnish and deliver automotive lubricants, as needed for the Division of Transportation, for the period May 1, 2021 through April 30, 2022, for a contract total not to exceed $30,000; Per renewal option under bid award 18-070-GV, third and final option to renew.
Member DeSart inquired about the reasoning for contract renewals versus going out for bid. Director Snyder advised that contract renewals at established pricing from previous years typically results in a cost savings to the County.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
L. DT-P-0083-21 Recommendation for the approval of a contract to Christopher B. Burke Engineering, Ltd., to provide Professional Preliminary (Phase I) Engineering Services for the Flashing Yellow Arrow Corridor Project along CH 38/63rd Street, from Suffield Court to Americana Drive, Section 20-00288-05-TL, for a contract total not to exceed $153,163.73; Professional Services (Architects, Engineers & Land Surveyors) vetted through a qualification-based selection process in compliance with the Illinois Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
M. DT-P-0084-21 Recommendation for the approval of a contract to DLZ Illinois, Inc., to provide Professional Design (Phase II) Engineering Services for the Central Signal System Expansion #4, Section 19-DCCSS-04-TL, for a contract total not to exceed $536,101.31; Professional Services (Architects, Engineers & Land Surveyors) vetted through a qualification-based selection process in compliance with the Illinois Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq. ($170,000 to be reimbursed by the Village of Lombard).
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
N. DT-P-0085-21 Recommendation for the approval of a contract to ESI Consultants, Ltd., to provide Professional Construction Engineering Services for the 2021 Pavement Maintenance (South) Program, Section 21-PVMTC-16-GM, for a contract total not to exceed $436,195.24; Professional Services (Architects, Engineers & Land Surveyors) vetted through a qualification-based selection process in compliance with the Illinois Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
O. DT-P-0086-21 Recommendation for the approval of a contract to Hampton, Lenzini and Renwick, Inc., for Professional Construction Engineering Services for improvements along CH 18/Kress Road, from Hawthorne Lane to Roosevelt Road, Section 20-00306- 05-RS, for a contract total not to exceed $308,598.98; Professional Services (Architects, Engineers & Land Surveyors) vetted through a qualification-based selection process in compliance with the Illinois Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
P. DT-P-0087-21 Recommendation for the approval of a contract to Stanley Consultants, Inc., to provide Professional Construction Engineering Services, upon request of the Division of Transportation, for a contract total not to exceed $400,000; Professional Services (Architects, Engineers & Land Surveyors) vetted through a qualification-based selection process in compliance with the Illinois Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Ozog, Puchalski, Zay
ABSENT: Krajewski
|
7. CHANGE ORDERS
Member Krajewski virtually joined the meeting at 10:10am
A. Change Order -- DT-P-0022A-21 - Amendment to Resolution DT-P-0022-21, issued to Accela, Inc., for a two (2) year subscription services agreement for software integration between Accela On-Line Permitting Software and Bluebeam Plan Review Software for the Division of Transportation, Stormwater Management, Building and Zoning and Public Works, to update the Governing Agreement terms of service with no change in County cost.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Brian J. Krajewski, District 3
AYES: Chaplin, DeSart, Krajewski, Ozog, Puchalski, Zay
|
8. AGREEMENTS
A. DT-R-0229-21 RESOLUTION -- Agreement between the County of DuPage and Progressive Rail Incorporated, for Railroad Crossing Improvements at CH 8;York Road, between Sievert Court and Foster Avenue, Section 20-00171-08-FP, for an estimated County cost $30,393.50.
RESULT: APPROVED [UNANIMOUS]
MOVER: Dawn DeSart, District 5
SECONDER: James Zay, District 6
AYES: Chaplin, DeSart, Krajewski, Ozog, Puchalski, Zay
|
B. DT-R-0230-21 RESOLUTION -- Amended and Restated Lease Agreement for Real Property between the County of DuPage and the City of Warrenville for the Maintenance and Improvement of the DuPage Parkway/Illinois Prairie Path Trailhead.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Krajewski, Ozog, Puchalski, Zay
|
9. AMENDING RESOLUTIONS
Motion to combine Items 9A through 9F
RESULT: APPROVED [UNANIMOUS]
MOVER: Elizabeth Chaplin, District 2
SECONDER: James Zay, District 6
AYES: Chaplin, DeSart, Krajewski, Ozog, Puchalski, Zay
|
A. Amendment -- DT-P-0233A-20 – Amendment to Resolution DT-P-0233-20 issued to Knight E/A, Inc., for improvements along CH 21/Fabyan Parkway, from Illinois Route 38 to the County Line, Section 08-00210-03-FP; Correction of Scrivener’s Error
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Krajewski, Ozog, Puchalski, Zay
|
B. Amendment -- DT-R-0189A-21 - Amendment to Resolution DT-R-0189-21, issued to Builders Paving, LLC, for improvements along CH 18/Kress Road, from Hawthorne Lane to Roosevelt Road, Section 20-00306-05-RS; Accounting Adjustment with no change in County cost.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Krajewski, Ozog, Puchalski, Zay
|
C. Amendment -- DT-R-0150A-21 - Amendment to Resolution DT-R-0150-21, Local Public Agency Agreement between the County of DuPage and Illinois Department of Transportation, for improvements along CH 20/Grand Avenue, from Lake Street to County Line Road, Section 17-00272-03-SP; Accounting Adjustment with no change in County cost.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Krajewski, Ozog, Puchalski, Zay
|
D. Amendment -- DT-R-0284A-19 - Amendment to Resolution DT-R-0284-19 for the re execution of a Local Public Agency Agreement between the County of DuPage and Illinois Department of Transportation, for improvements along CH 21/Geneva Road over the West Branch of the DuPage River, Section 18-00206-10-BR, with no change in County cost.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Krajewski, Ozog, Puchalski, Zay
|
E. Amendment -- DT-R-0921A-18 - Amendment to Resolution DT-R-0921-18, Intergovernmental Agreement between the County of DuPage and Village of Carol Stream, for mowing along County Roads and Rights-of-Way, to increase the funding in the amount of $1,660, resulting in an amended County cost of $74,020, an increase of 2.29%.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Krajewski, Ozog, Puchalski, Zay
|
F. Amendment -- DT-R-0019A-19 - Amendment to Resolution DT-R-0019-19, Intergovernmental Agreement between the County of DuPage and Winfield Road District, for mowing along County Roads and Rights-of-Way, to increase the funding in the amount of $28,470, resulting in an amended County cost of $77,490, an increase of 58.08%.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Zay, District 6
SECONDER: Elizabeth Chaplin, District 2
AYES: Chaplin, DeSart, Krajewski, Ozog, Puchalski, Zay
|
Vice Chair Ozog left the meeting at 8:14am
10. INFORMATIONAL
A. Informational -- Electricity Bid
11. REPORT FROM STATE'S ATTORNEY
12. OLD BUSINESS
13. NEW BUSINESS
Member Krajewski referenced an issue he experienced the prior Friday regarding traffic control at 75th Street and Exner/Williams. The flagger was not certified. Director Snyder advised standard specifications required flaggers to be certified in the past and would confirm this is still the case. Subcontractor foreman was informed of the incident.
14. ADJOURNMENT
http://dupage.iqm2.com/Citizens/FileOpen.aspx?Type=12&ID=7615&Inline=True